Film Developing Review

  1. When you are in complete darkness, open the canister, remove the film, load the film onto a reel and place reel in a developing tank.
  2. Next, pour the developer in the developing tank and agitate it for 5 minutes every 30 seconds.
  3. Pour out the developer and do not take the top off.
  4. The next step is to pour the stop bath for 1 minutes and 20 seconds so that the remains of the developer is neutralized and the developer process is arrest.
  5. Next is the fixer bath and pour it until its full. 6 minutes and agitate for of 3 seconds every 30 seconds.
  6. Pour out fixer after 6 minutes.
  7. Then, put the reel back in and put the hypo-clearing agent(Basically H2O) and leave for 10 minutes.
  8. After, take it out and you can now open the tank and expose the negative to light for the final product.
Link: www.youtube.com/watch?v=Vu0Ul_wsYO8

Leave a Reply

Your email address will not be published. Required fields are marked *