Pleasant Grove High School
Project Address: 9531 Bond Rd, Elk Grove, CA 95624
Updates & Renovation
Lighting – Multi-Purpose Room
Project Dates: May – August 2019
Lighting replaced and upgraded to more energy efficient fixtures in the multi-purpose room.
Contractor: Marcom Electrical (Sacramento, CA)
Lighting
Project Dates: January – May 2019
Lighting upgraded with more energy efficient fixtures in the main and auxiliary gymnasium.
Contractor: ReGreen, Inc. (El Segundo, CA)
Bioscience Building
Project Dates: August 2018 – February 2019
Construction completed for one relocatable, modular, bio-science building. Site work included gas, water, sewer, low voltage in the building, fencing, and accessibility upgrades.
Contractor: Abide Builders, Inc. (Colfax, CA)
Scoreboard
Project Dates: June – September 2018
New 24′ x 8′ energy-efficient LED electronic scoreboard installed for football, soccer, and track events.
Contractor: Recreation Science, Inc. (Colfax, CA)
Track & Field
Project Dates: July 2017 – July 2018
Upgrade of the athletic field from decomposed granite/grass turf to an all-weather track and synthetic turf field. Both surfaces now have increased playability, extending the playing season and making them less susceptible to damage from overuse. The Mondotrack surface is specifically designed for superior athletic performance; it provides the optimum blend of shock absorption and rebound elasticity for all track events.
Contractor: Robert A. Bothman Construction (Fair Oaks, CA)
Design: Verde Design (Folsom, CA)