Florin High School

Project Address: 7956 Cottonwood Lane, Sacramento, CA 95828

 

 

Updates & Renovation


 

Security System Upgrade

Project Dates: July 2019 – April 2020

Installation of new security cameras with associated materials and software. The school is one of six (6) pilot sites at which a new security camera system will be implemented and evaluated for its suitability of use at EGUSD sites district-wide. Installation will be completed by the end of 2019 with system testing during the first quarter of 2020.

Contractor: Trofholz Technologies, Inc. (Rocklin, CA)

 

Fire Alarm System

Project Dates: May – October 2019

Installation of new campus-wide fire alarm system. 

Contractor: Studebaker Brown Electric, Inc. (North Highlands, CA)

 

 

 

 

 

Updates & Renovation


Security System Upgrade

Project Dates: July 2019 – April 2020

Installation of new security cameras with associated materials and software. The school is one of six (6) pilot sites at which a new security camera system will be implemented and evaluated for its suitability of use at EGUSD sites district-wide. Installation will be completed by the end of 2019 with system testing during the first quarter of 2020.

Contractor: Trofholz Technologies, Inc. (Rocklin, CA)

Fire Alarm System

Project Dates: May – October 2019

Installation of new campus-wide fire alarm system.

Contractor: Studebaker Brown Electric, Inc. (North Highlands, CA)

Lighting – Gyms

Project Dates: May – September 2019

Lighting replaced and upgraded with more energy-efficient fixtures in the main and auxiliary gymnasium. 

Contractor: ReGreen, Inc. (El Segundo, CA)

Interior Lighting

Project Dates: June – December 2019

Interior lighting replaced campus-wide. 

Contractor: Clear Blue Energy Corporation (San Diego, CA)

Dust Collector Replacement

Project Dates: May – November 2018

Replacement of the existing dust collector serving the woodshop and reconnection to the existing duct work system. Existing ducts cleaned. 

Contractor: Miller Mechanical (Cool, CA)

Scoreboard

Project Dates: June – September 2018

New 24′ x 8′ energy-efficient LED electronic scoreboard installed for football, soccer, and track events.

Contractor: Recreation Science, Inc. (Colfax, CA)

Track & Field

Project Dates: July 2017 – June 2018

Upgrade of the athletic field from decomposed granite/grass turf to an all-weather track and synthetic turf field. Both surfaces now have increased playability, extending the playing season and making them less susceptible to damage from overuse. The Mondotrack surface is specifically designed for superior athletic performance; it provides the optimum blend of shock absorption and rebound elasticity for all track events.

Contractor: Robert A. Bothman Construction (Fair Oaks, CA)

Design: Verde Design (Folsom, CA)

Roofing, HVAC, Lighting & Painting

Project Dates: July 2017 – April 2018

New roof installed with composition shingle roofing where skylights were replaced. Parapet cap flashing metal was replaced with new pre-finished cap flashing. Replacement of existing HVAC roof top package units on ten (10) permanent buildings and BARD units on seventeen (17) modular building classrooms. Replacement of 29 rooftop skylights and their automated metal shade or louver system, as well as exterior wall- and soffit-mounted light fixtures with new LED lights. Repainting of the entire campus with sealant applied to all natural finished brick veneer.

Contractor: F&H Construction (Lodi, CA)

Upcoming Projects

Security Cameras

Installation of new security camera/video surveillance systems

 Shade Structures

Installation of all-steel shade shelters to protect playground and outdoor seating areas from excessive heat and sun. Structures will be permanently mounted on a concrete pad.