Herman Leimbach Elementary
Project Address: 8101 Grandstaff Drive, Sacramento, CA 95823
Updates & Renovation
Shade Structure
Project Dates: October 2019 – February 2020
Installation of an outdoor shade structure to include accessibility improvements and concrete pads.
Contractor: A.M. Stephens Construction Co., Inc. (Lodi, CA)
Proposition 39 Modernization Improvements
Project Dates: April – August 2019
Funded in part by Proposition 39 and in part by Measure M, the school will receive replacement of HVAC equipment/units, lighting, and partial roofing. The Proposition 39 K-12 Program is a five-year, State of California initiative to “improve energy efficiency and expand clean energy generation in schools.”
Construction (Track & Field): Robert A. Bothman Construction (Fair Oaks, CA)
Project Address: 8101 Grandstaff Dr, Sacramento, CA 95823
Updates & Renovation
Roofing
Project Dates: March – August 2018
New roof system installed that is a combination of Energy Star rated, single-ply and AlphaGuard BIO urethane on the library, multi-purpose room, and C and E wings.
Contractor: Rua & Son Mechanical, Inc. (Lincoln, CA)
Shade Structure
Project Dates: October 2019 – February 2020
Installation of an outdoor shade structure to include accessibility improvements and concrete pads.
Contractor: A.M. Stephens Construction Co., Inc. (Lodi, CA)
Proposition 39 Modernization Improvements
Project Dates: April – August 2019
Funded in part by Proposition 39 and in part by Measure M, the school will receive replacement of HVAC equipment/units, lighting, and partial roofing. The Proposition 39 K-12 Program is a five-year, State of California initiative to “improve energy efficiency and expand clean energy generation in schools.”
Construction (Track & Field): Robert A. Bothman Construction (Fair Oaks, CA)
Upcoming Projects
Shade Structures
Installation of all-steel shade shelters to protect playground and outdoor seating areas from excessive heat and sun. Structures will be permanently mounted on a concrete pad.