Laguna Creek High School
Project Address: 9050 Vicino Dr, Elk Grove, CA 95758
Updates & Renovation
Lighting – Multi-Purpose Room
Project Dates: March – August 2019
Lighting replaced and upgraded to more energy efficient fixtures in the multi-purpose room.
Contractor: Marcom Electrical (Sacramento, CA)
Lighting – Gyms
Project Dates: January – May 2019
Lighting upgraded with more energy efficient fixtures in the main and auxiliary gymnasium.
Contractor: ReGreen, Inc. (El Segundo, CA)
Sports Career Academy
Project Dates: November 2018 – April 2019
Construction of an addition to the existing Sports Career Academy consisting of a light-frame, wood structure on a concrete foundation. Project included associated site work and ADA upgrades.
Contractor: Kaler/Dobler Construction, Inc. (Rancho Cordova, CA)
Scoreboard
Project Dates: June – September 2018
New 24′ x 8′ energy-efficient LED electronic scoreboard installed for football, soccer, and track events.
Contractor: Recreation Science, Inc. (Colfax, CA)
Track & Field
Project Dates: July 2017 – July 2018
Upgrade of the athletic field from decomposed granite/grass turf to an all-weather track and synthetic turf field. Both surfaces now have increased playability, extending the playing season and making them less susceptible to damage from overuse. The Mondotrack surface is specifically designed for superior athletic performance; it provides the optimum blend of shock absorption and rebound elasticity for all track events.
Contractor: Robert A. Bothman Construction (Fair Oaks, CA)
Design: Verde Design (Folsom, CA)