Franklin High School

 

Project Address: 6400 Whitelock Pkwy, Elk Grove, CA 95757

 

 

Updates & Renovation


Fencing & Gates

Project Dates: April – November 2019

Installation and upgrade of sports field fencing and gates with associated signage, concrete and asphalt paving work. Installation of new automated traffic gates.

Contractor: Pisor Fence Division, Inc. (Antelope, CA)

Lighting – Multi-Purpose Room

Project Dates: March – August 2019

Lighting replaced and upgraded with more energy efficient fixtures in the multi-purpose room. 

Contractor: Marcom Electrical (Sacramento, CA)

CTE

Project dates: April – July 2019

New electrical system installed for equipment used in the Engineering Pathway. 

Contractor: Ample Electric, Inc. (Winters, CA)

Lighting – Gyms

Project Dates: January – May 2019

Lighting upgraded with more energy efficient fixtures in the main and auxiliary gymnasium. 

Contractor: ReGreen, Inc. (El Segundo, CA)

Scoreboard

Project Dates: June – September 2018

New 24′ x 8′ energy-efficient LED electronic scoreboard installed for football, soccer, and track events.

Contractor: Recreation Science, Inc. (Colfax, CA)

Track & Field

Project Dates: July 2017 – July 2018

Upgrade of the athletic field from decomposed granite/grass turf to an all-weather track and synthetic turf field. Both surfaces now have increased playability, extending the playing season and making them less susceptible to damage from overuse. The Mondotrack surface is specifically designed for superior athletic performance; it provides the optimum blend of shock absorption and rebound elasticity for all track events.

Contractor: Robert A. Bothman Construction (Fair Oaks, CA)

Design: Verde Design (Folsom, CA)

Roofing

Project Dates: March – May 2018

Removal of the existing roof and installation of a new Energy Star rated, single-ply system on the weight room.

Construction: MCM Roofing Company, Inc. (McClellan Park, CA)