Sheldon High School

Project Address: 8333 Kingsbridge Dr, Sacramento, CA 95829

 

 

Updates & Renovation


HVAC

Project Dates: May – November 2019

Installation of new HVAC equipment campus-wide with accessibility upgrades and structural enhancements. 

Contractor: REM Construction, Inc. (Sacramento, CA)

 

 

Project Address: 8333 Kingsbridge Dr, Sacramento, CA 95829

 

Updates & Renovation


HVAC

Project Dates: May – November 2019

Installation of new HVAC equipment campus-wide with accessibility upgrades and structural enhancements.

Contractor: REM Construction, Inc. (Sacramento, CA)

Lighting – Multi-Purpose Room

Project Dates: May – August 2019

Lighting replaced and upgraded to more energy efficient fixtures in the multi-purpose room. 

Contractor: Marcom Electrical (Sacramento, CA)

Lighting

Project Dates: January – May 2019

Lighting upgraded with more energy efficient fixtures in the main and auxiliary gymnasium. 

Contractor: ReGreen, Inc. (El Segundo, CA)

Flooring

Project Dates: January – September 2018

Removal and replacement of the entire gymnasium floor due to water damage.

Contractor: Boberg Hardwood Floors (Loomis, CA)

Roofing – phase 2

Project Dates: March – August 2018

New Energy Star rated, single-ply roofing system installed on the gymnasium.

Contractor: D7 Roofing (Sacramento, CA)

Roofing – phase 1

Project Dates: July – August 2017

New roof installed on Performing Arts Center and one portable building to stop ongoing leaks and further damage to structures.

Contractor: California Single Ply, Inc. (Rocklin, CA)