Robert J. Fite Elementary

Project Address: 7956 Cottonwood Lane, Sacramento, CA 95828

Project Dates: July – November 2017

Construction Cost: $6.7 million

Funding Source(s): Measure M*

 

Updates & Renovation


Track & Field ($4.5 million)

The athletic field will be upgraded from its current decomposed granite/grass to an eight-lane, 400-meter, all-weather track and new synthetic turf field. The new materials will offer a safer and more reliable performance surface for student athletes. The new field will be more resilient in seasonal water and heat, reducing surface temperatures and providing increased shock absorption. Additional new upgrades will include:

  • a soccer field measuring 65 by 116 yards
  • a full-size football field
  • improved lighting
  • new facilities for shot put, discus, long and triple jump, and pole vaulting

Other Upgrades ($2.2 million)

Roofing
New roof installed with composition shingle roofing where skylights are being replaced. Parapet cap flashing metal will be replaced with new pre-finished cap flashing.

HVAC
Replacement of all existing HVAC units on 10 permanent buildings and 17 modular building classrooms.

Lighting
Replacement of 29 rooftop skylights and their automated metal shade or louver system, as well as exterior wall- and soffit-mounted light fixtures with new LED lights.

Painting
The entire campus will be repainted and sealant will be applied to all natural finished brick veneer.

Construction (Track & Field): Robert A. Bothman Construction (Fair Oaks, CA)

Design (Track & Field): Verde Design (Folsom, CA)

Construction (Other Upgrades): F&H Construction

* State Bond funding may be applied back to this project at a later date to offset some of the Measure M funds used.